First, let’s take a look at the carnage topside.
As you can see, it’s been routed for a toggle switch on the lower horn. Someone chiseled out a shapely overflow into the control cavity for the massive swimming pool route.
The trem route has been gutted down the middle and filled with glue and BB’s for fucks sake. Bridge cup holes were filled and they started drilling new holes in a different location. Numerous dents and dings scattered about.
Now the back.
The edge on the lower bout at the control cavity has been drilled for a jack that was never installed.
Well, that what we’re faced with. I’ll post more tomorrow.