Here's what I have so far:

I just got the MOP today. Now I'm waiting for the router attachment for the dremel to get started on the blocks.
Still need to get:
wiring and all pots and switches
mustang bridge, saddles and cups
neck pickup
copper shielding tape
jack
strap buttons
screws
(Did I forget anything?)
Here's my tape job for the blocks:

First question of this thread:
Here is a pic of the neck (almost) in the pocket. It's about a millimetre off. My question is do I shave that millimetre from the left side of this pic or from the right side of this pic or a tiny bit from both sides?

Thanks for your help.